Abstract:A decision-making strategy based on multi-objective optimization of the environment and social economy for the remediation of redeveloped contaminated site was constructed in this study, and a case study was carried out on the basis of this novel approach. The results reveal that:the remediation volume could be reduced by 62.5% through land use planning adjustments following the Class II Land remediation standards (GB3660-2018), which will decrease the environmental adverse effects; After multi-objective optimization of the land use planning and remediation strategies, the remediation cost could be reduced by 28.3% and 27.4%, respectively. Furthermore, the optimization of land-use intensity could increase the income by 24.3% while taking multiple social sustainable goals into account simultaneously. The break-even analysis of multi-objective optimization show that the increase in land revenue by elevating the land-use intensity would be higher than that of the remediation cost, and the break-even point will be achieved only when a certain degree of land-use intensity was reached. The multi-objective optimized remediation strategy balanced the powers and capital relations of different stakeholders (including the local government, the public, site owners, and the land developers) and ensured both environmental and socio-economic benefits of remediation, aligning well with the green and sustainable remediation and redevelopment goals.
金远亮, 侯德义, 田莉, 王刘炜, 宋易南. 基于用地规划的污染地块修复多目标优化研究[J]. 中国环境科学, 2021, 41(2): 787-800.
JIN Yuan-liang, HOU De-yi, TIAN Li, WANG Liu-wei, SONG Yi-nan. Multi-objective optimization for brownfield remediation on the basis of land use planning. CHINA ENVIRONMENTAL SCIENCECE, 2021, 41(2): 787-800.
谭豪波,赵岩,孙峥,等.废弃场地修复的微尺度生态安全评估优化体系[J]. 中国环境科学, 2016,36(7):2169-2177.Tan Haobo, Zhao Yan, Sun Zhen, et al. Ecological security evaluation and optimization system for microscale remediation of abandoned terrestrial field[J]. China Environmental Science, 2016,36(7):2169-2177.
[2]
O'Connor D, Zheng X, Hou D, et al. Phytoremediation:Climate change resilience and sustainability assessment at a coastal brownfield redevelopment[J]. Environment International, 2019,130:1-9.
[3]
Wang L, Peng L, Xie L, et al. Compatibility of Surfactants and Thermally Activated Persulfate for Enhanced Subsurface Remediation[J]. Environmental Science & Technology, 2017:A-J.
[4]
De Sousa C A. Turning brownfields into green space in the City of Toronto[J]. Landscape and Urban Planning, 2003,62(4):181-98.
[5]
Wu Q, Zhang X, Liu C, et al. The de-industrialization, re-suburbanization and health risks of brownfield land reuse:Case study of a toxic soil event in Changzhou, China[J]. Land Use Policy, 2018, 74:187-194.
[6]
邓一荣,刘丽丽,李韦钰,等.基于健康风险评估的棕地再开发利用控规优化研究[J]. 生态经济, 2019,35(8):223-229.Deng Yirong, Liu Lili, Li Weiyu, et al. Optimization for regulatory detailed planning of brownfield redevelopment based on human health risk assessment[J]. Ecological Economy, 2019,35(8):223-229.
[7]
Lange D, McNeil S. Clean it and they will come? Defining successful brownfield development[J]. Journal of Urban Planning and Development-Asce, 2004,130(2):101-8.
[8]
Morio M, Schadler S, Finkel M. Applying a multi-criteria genetic algorithm framework for brownfield reuse optimization:Improving redevelopment options based on stakeholder preferences[J]. Journal of Environmental Management, 2013,130:331-346.
[9]
Chen I C, Chuo Y Y, Ma H W. Uncertainty analysis of remediation cost and damaged land value for brownfield investment[J]. Chemosphere, 2019,220:371-380.
[10]
Poggio L, Vrscaj B, Hepperle E, et al. Introducing a method of human health risk evaluation for planning and soil quality management of heavy metal-polluted soils-An example from Grugliasco (Italy)[J]. Landscape and Urban Planning, 2008,88(2-4):64-72.
[11]
周聪惠.美国"超级基金"制度研究-探索污染土地修复中的用地规划协调途径[J]. 国际城市规划, 2013,(6):93-100.Zhou Conghui. Research on the US Superfund System:Exploring the method for the land use planning coordination in the contaminated land remediation process[J]. Urban Planning International, 2013,(6):93-100.
[12]
刘迪,孙娟,刘璟.结合棕地治理与改造的规划编制研究_以株洲清水塘老工业区控规为例[J]. 城市规划学刊, 2014,214:99-105.Liu Di, Sun Juan, Liu Jing. A research planning of brownfield in Qingshui Tang Industrial Area in Zhuzhou[J]. Urban planning forum, 2014,214:99-105.
[13]
Lavee D, Ash T, Baniad G. Cost-benefit analysis of soil remediation in Israeli industrial zones[J]. Natural Resources Forum, 2012,36(4):285-99.
[14]
Volchko Y, Norrman J, Rosen L, et al. Cost-benefit analysis of copper recovery in remediation projects:A case study from Sweden[J]. Science of the Total Environment, 2017,605:300-14.
[15]
Ameller J, Rinaudo J D, Merly C. The contribution of economic science to brownfield redevelopment:A Review[J]. Integrated Environmental Assessment and Management, 2019.
[16]
Bartke S. Valuation of market uncertainties of contaminated land[J]. International Journal of Strategic Property Management, 2011,15(4):356-78.
[17]
Green T L. Evaluating predictors for brownfield redevelopment[J]. Land Use Policy, 2018,73:299-319.
[18]
Alberini A, Longo A, Tonin S, et al. The role of liability, regulation and economic incentives in brownfield remediation and redevelopment:evidence from surveys of developers[J]. Regional Science and Urban Economics, 2005,35(4):327-51.
[19]
Hou D, Al-Tabbaa A, Guthrie P, et al. Using a hybrid LCA method to evaluate the sustainability of sediment remediation at the London Olympic Park[J]. Journal of Cleaner Production, 2014,83:87-95.
[20]
Lesage P, Ekvall T, Deschenes L, et al. Environmental assessment of Brownfield rehabilitation using two different life cycle inventory models -Part 2:Case study[J]. International Journal of Life Cycle Assessment, 2007,12(7):497-513.
[21]
Hou D, Al-Tabbaa A. Sustainability:A new imperative in contaminated land remediation[J]. Environmental Science & Policy, 2014,39:25-34.
[22]
侯德义.污染场地绿色可持续修复方法与应用[M]. 北京:科学出版社, 2017:84-92.Hou Deiyi. Methods and application of green and sustainable of contaminated sites remediation[M]. Beijing:Science Press, 2017:84-92.
[23]
T/CAEPI 26-2020污染地块绿色可持续修复通则[S]. T/CAEPI 26-2020 Principles for Green and Sustainable Remediation[S].
[24]
Lin H L, Zhu Y M, Ahmad N, et al. A scientometric analysis and visualization of global research on brownfields[J]. Environmental Science and Pollution Research, 2019,26(17):17666-84.
[25]
Linkov I, Satterstrom F K, Kiker G, et al. From comparative risk assessment to multi-criteria decision analysis and adaptive management:Recent developments and applications[J]. Environment International, 2006,32(8):1072-93.
[26]
Wedding G C, Crawford-Brown D. Measuring site-level success in brownfield redevelopments:A focus on sustainability and green building[J]. Journal of Environmental Management, 2007,85(2):483-95.
[27]
Zavadskas E K, Antucheviciene J. Development of an indicator model and ranking of sustainable revitalization alternatives of derelict property:A Lithuanian case study[J]. Sustainable Development, 2006, 14(5):287-99.
[28]
张丽娜,姜林,钟茂生,等.基于用地规划的大型污染场地健康风险评估[J]. 环境科学研究, 2015,5(28):788-95.Zhang Lina, Jiang Lin, Zhong Maosheng, et al. Risk assessment based on planning scenarios for a large-scale contaminated Site[J]. Research of Environmental Sciences, 2019,35(8):223-9.
[29]
Schadler S, Morio M, Bartke S, et al. Integrated planning and spatial evaluation of megasite remediation and reuse options[J]. Journal of Contaminant Hydrology, 2012,127(1-4):88-100.
[30]
环境保护部.污染地块土壤环境管理办法(环境保护部42号令)[S]. 北京:环境保护部, 2017.CAEPI. Administrative measures for the soil environment of the contaminated land parcel (for Trial Implementation)(No. 42)[S]. Beijing; Ministry of Ecology and Environmental of the People's Republic of China, 2017.
[31]
陈银蓉,梅昀,孟祥旭,等.经济学视角下城市土地集约利用的决策分析[J]. 资源科学, 2013,35(4):739-48.Chen Yinrong, Mei Yun, Meng Xiangxu, et al. Decision analysis of urban land intensive use from the perspective of economics[J]. Resources Science, 2013,35(4):739-48.
[32]
GB36600-2018建设用地土壤污染风险管控标准(试行)土壤环境质量[S].GB36600-2018 Soil environment quality risk control standard for soil contamination of development land (On Trail)[S].
[33]
HJ25.3-2019建设用地土壤污染风险评估技术导则[S].HJ25.3-2019 Technical guidelines for risk assessment of soil contamination of land for construction[S].
[34]
CAEPI 1-2015污染场地修复技术筛选指南[S].CAEPI 1-2015 Guideline on technology screening in contaminated site remediation[S].
[35]
Kaufman M M, Rogers D T, Murray K S. An empirical model for estimating remediation costs at contaminated sites[J]. Water Air and Soil Pollution, 2005,167(4):365-86.
[36]
张红振,董璟琦,吴舜泽,等.某焦化厂污染场地环境损害评估案例研究[J]. 中国环境科学, 2016,36(10):3159-65.Zhang Hongzhen, Dong Jingqi, Wu shun-ze, et al. Environmental damage assessment case study of a cooking plant contaminated site[J]. China environmental science, 2016,36(10):3159-65.
[37]
环境保护部.2014年污染场地修复技术目录(第一批)[Z]. 北京:环境保护部, 2014.Ministry of Ecological Environment. Technical catalog of contaminated site remediation in 2014(first batch)[Z]. Beijing:Ministry of Ecology and Environmental of the People's Republic of China. 2014.
[38]
武晓峰,谢磊,赵洪阳.土壤及地下水污染点不同暴露途径的健康风险比较[J]. 中国环境科学, 2012,32(2):345-50.Wu Xiaofeng, Xie lei, Zhao Hongyang. Comparative study on the health risk of different exposure pathways at soil and groundwater contaminated sites[J]. China environmental science, 2012,32(2):345-50.
[39]
Esty D C, Levy M, Srebotnjak T, et al. 2005 Environmental sustainability index:Benchmarking national environmental stewardship[M]. Yale Center for Environmental Law & Policy Yale University, 2005.
[40]
Nations U. Earth Summit:Agenda 21; the United Nations programme of action from Rio; proceedings of the Earth Summit Agenda 21the United Nations Programme of Action from Rio, F, 1992[C].
[41]
Song Y, Hou D, Zhang J, et al. Environmental and socio-economic sustainability appraisal of contaminated land remediation strategies:A case study at a mega-site in China[J]. Science of the Total Environment, 2018,610:391-401.
[42]
Song Y, Kirkwood N, Maksimovic C, et al. Nature based solutions for contaminated land remediation and brownfield redevelopment in cities:A review[J]. Science of the Total Environment, 2019,663:568-579.
[43]
宋健,吴剑锋,杨蕴,等.基于含水层DNAPL污染修复替代模型的多目标优化研究[J]. 中国环境科学, 2016,36(11):3390-3396.Song Jian, Wu Jianfeng, Yang yun, et al. A Kriging-based surrogate model for multi-objective optimization of DNAPL-contaminated aquifer remediation[J]. China environmental science, 2016,36(11):3390-3396.
[44]
Gelfand A E, Ecker M D, Knight J R, et al. The dynamics of location in home price[J]. Journal of Real Estate Finance and Economics, 2004,29(2):149-66.
[45]
生态环境部.污染场地修复技术应用指南[S]. 北京:中国环境出版集团, 2014.Ministry of Ecological Environment. Guideline on technology application in contaminated sites remediation[S]. Beijing; China Environmental Science Press, 2014.
[46]
住房和城乡建设部. GB50180-2018城市居住区规划设计标准[S]. 北京:住房和城乡建设部, 2018.Ministry of housing and Urban-Rural development. GB50180-2018 Standard for urban residential area planning and design[S]. Beijing:Ministry of housing and Urban-Rural development. 2018.
[47]
邓安琪,董兆敏,高群,等.中国地下水砷健康风险评价[J]. 中国环境科学, 2017,37(9):3556-3565.Deng Anqi, Dong Zaomin, Gao Qun, et al. Health risk assessment of arsenic in groundwater across China[J]. China environmental science, 2017,37(9):3556-3565.
[48]
刘庚,石瑛,田海金,等.某大型砷渣场地土壤As污染特征及生态风险评价[J]. 环境科学, 2018,39(12):5639-5646.Liu Gen, Shi Ying, Tian Haijin, et al. Soil pollution characteristics and ecological risk assessment of As at a large scale arsenic slag-contaminated site[J]. Environmental Science, 2018,39(12):5639-5646.
[49]
Delsarte I, Danjou P E, Veignie E, et al. Synthesis of modified potato starches for aqueous solubilization of benzo a pyrene[J]. Carbohydrate Polymers, 2016,144:83-89.
[50]
中国国家统计局.分省年度数据[EB/OL]. http://data.stats.gov.cn/index.htm. National Bureau of Statistics of China. Annual data by province[EB/OL]. http://data.stats.gov.cn/index.htm.
[51]
Peng C, Chen W P, Liao X L, et al. Polycyclic aromatic hydrocarbons in urban soils of Beijing:Status, sources, distribution and potential risk[J]. Environmental Pollution, 2011,159(3):802-808.
[52]
魏复盛,杨国治,蒋德珍,等.中国土壤元素背景值基本统计量及其特征[J]. 中国环境监测, 1991,7(1):1-6.Wei fusheng, Yang guozhi, Jiang Dezhen, et al. The element background values basic statistics and characteristics of China soil[J]. Environmental Monitoring in China, 1991,7(1):21-26.
[53]
Katsumata P T, Kastenberg W E. On the Impact of Future Land Use Assumptions on Risk Analysis for Superfund Sites[J]. Journal of the Air & Waste Management Association, 1997,47:881-889.
[54]
Schädler S, Morio M, Bartke S, et al. Designing sustainable and economically attractive brownfield revitalization options using an integrated assessment model[J]. Journal of Environmental Management, 2011,92(3):827-37.
[55]
Hou D. Sustainable Remediation of Contaminated Soil and Groundwater:Materials, Processes, and Assessment[M]. United Kingdom:Matthew Deans, 2020:433-451.
[56]
Hou D, Bolan N S, Tsang D C W, et al. Sustainable soil use and management:An interdisciplinary and systematic approach[J]. The Science of the total environment, 2020,729:138961.
[57]
Hou D, Song Y, Zhang J, et al. Climate change mitigation potential of contaminated land redevelopment:A city-level assessment method[J]. Journal of Cleaner Production, 2018,171:1396-406.
[58]
Hou D, Qi S, Zhao B, et al. Incorporating life cycle assessment with health risk assessment to select the ‘greenest’ cleanup level for Pb contaminated soil[J]. Journal of Cleaner Production, 2017,162:1157-1168.
[59]
O'Connor D, Hou D, Ok Y S, et al. The effects of iniquitous lead exposure on health[J]. Nature Sustainability, 2020,3(2):77-79.
[60]
EPA U S. Reusing Cleaned Up Superfund Sites:Ecological Use Where Waste is Left on Site[M]. Washington, D.C.:Office of Solid Waste and Emergency Response; U.S. Environmental Protection Agency. 2006.
[61]
中央全面深化改革委员会第十一次会议.关于构建现代环境治理体系的指导意见[Z]. 2019-11.26.The 11th meeting of the central committee for deepening overall reform. The Guiding Opinions on Building a Modern Environmental Governance System[Z]. 2019-11.26.